Showing 79 results

Authority record
Corporate body

McKewen Studio

  • UA 8.7.1.8
  • Corporate body

Address: 407 Garfield

Richards Photo Service

  • UA 8.7.1.9
  • Corporate body

Names: Richards Film Service (1919), Richards Commercial Photo Service (1949)
Address: C of C Building

Hartsook Studio

  • UA 8.7.1.4
  • Corporate body

Addresses: 901 Commerce, Rust Building, Townsend Building, Rust Building

Holden Village

  • ELCA 7.3.1
  • Corporate body
  • 1957-present

In 1896, James Henry Holden made his first claim on the area which would later become Holden Village. However, due to the expense and difficulty involved in transporting copper from the isolated mine, the operation did not begin its full productivity until 1937. By 1938 the mine had become successful and processed 2,000 pounds of copper ore daily.

The Howe Sound Company built a town site on the north side of Railroad Creek soon after the mine began to thrive. The town site consisted of a number of dormitories, a gymnasium, bowling alley, mess hall, school, and hospital, among other things. West of the town site was a patch of small houses intended for miners and their families. The Holden Mine and its town site flourished for many years despite the isolation. However, after World War II the price of metal fell and the resources of the mine began to diminish. The mine was closed in 1957.

With the closing of the mine in 1957, the Howe Sound Company sought a buyer for the Holden Mine and town site. With an asking price of $100,000, the remote piece of property did not sell. However, Wes Prieb, a man active in the Lutheran Bible Institute of Seattle, saw the potential for a spiritual retreat center at the old mine. Originally he asked the Howe Sound Company to give the land to the Lutheran Church as a gift. The Company refused, but eventually agreed to sell the mine, town site, and all the land for one dollar.

With the purchase of the land came a multitude of problems for the Lutheran Bible Institute. The structures were old and decrepit. Many were on the brink of collapse and those that still stood did not meet current building codes. With the help of large brigades of volunteers, the Lutheran Bible Institute successfully cleaned and refurbished many of the buildings. The Village began to function as a summer retreat center soon afterward. Originally, the Lutheran Bible Institute imagined a summer-only center, and kept limited staff on-hand for the first few winters. However, both the infrastructure needs of the community and the natural beauty of Holden Village in the winter led to the creation of a year-round retreat center.

Today, Holden Village operates as a year-round retreat center and is one of the most remote continuously inhabited places in the contiguous United States. Largely run by volunteers, the Village offers educational programming and outdoor recreation opportunities to visitors from all over the world.

Zion Lutheran Church (Juliaetta, Idaho)

  • ELCA 4.2.3
  • Corporate body
  • 1883-2012

The early history of Zion Lutheran Church of Juliaetta, Idaho is closely connected with the history of Lutheran families of this vicinity. Florian Schaupfer came from Steirmarck, Austria, to Juliaetta in the fall of 1883 with his wife and two children. The first Lutheran services in this community were held in a log school house on the Florian Schaupfer Homestead. These first services were conducted by Reverend Zelle of the Missouri Synod, who came from Pendleton every six weeks. Reverend Anton Horn, Ohio Synod missionary in the Northwest, was the next to conduct services in the Florian Scharpfer home. He also started work in Cameron. Reverend H. Rieke was located in Genesee, Idaho, and organized the Cameron and Juliaetta congregations.

In 1904 the church was purchased at a cost of $400. In the summer of 1937 it was completely redecorated and other renovations were made. Fire destroyed the church in the early 1950’s, and a new structure was built 1956. After declining in numbers the congregation voted to dissolve July 1, 2012.

First Lutheran Church (Baker City, Oregon)

  • ELCA 6.2.2
  • Corporate body
  • 1921-2011

In 1919 Reverend W.F. Schmidt, the Field Missionary of the North Pacific District of the Lutheran Church, began a nucleus of a church in Baker after several prior attempts were made to organize a congregation were unsuccessful. A Ladies Aid was formed in 1920. In July of 1920 Reverend Joh Groschupf became the first permanent pastor. He organized the Sunday School and began confirmation classes. Official organization occurred on July 12, 1922.

In 1923 the lot on which the church was built was purchased by the Mission Board of the church (prior services were held in the Adventist Church). Consecration for the first church took place on June 20, 1926. The present building was dedicated on July 22, 1951. The congregation voted to remove their membership from the ELCA on March 15, 2011.

Community of Life Lutheran Church (Boise, Idaho)

  • ELCA 4.2.2
  • Corporate body
  • 2000-2003

Community of Life was organized June 18, 2000. They worked with Trinity Presbyterian Church and talked about having a joint congregation. When this did not work out the congregation voted to dissolve in fall of 2003.

Brownsville Lutheran Church (Brownsville, Oregon)

  • ELCA 6.2.3
  • Corporate body
  • 1978-1991

On October 10, 1976, an exploratory meeting was held at Michael and Kathy Nida’s home to discuss starting a preaching ministry. The first meeting of the fledgling group was October 24 in the Brownsville Recreation Center. There were 35 people in attendance, and at the meeting officers were elected.

The first move took place April 24, 1977, when the group moved into the Brownsville Elementary School for their education classes and worship services. The first services of the congregation were conducted by the Lutheran pastors of the surrounding area who took turns being responsible for their assigned Sundays.

On February 26, 1977, the mission group moved into the newly built Community Library building at Spalding and Averill and Reverend Ed Anderson of Eugene became the third pastor to serve this mission group. This group was formally received as a congregation of the American Lutheran Church on May 21, 1978. The congregation's last service was Easter Sunday, March 31, 1991.

Faith Lutheran Church (Nyssa, Oregon)

  • ELCA 6.2.4
  • Corporate body
  • 1947-1990

The first service was held Palm Sunday of 1947 at the Veteran’s Housing Administration Building with twenty in attendance. The lots were purchased that year, and in 1948 a decision was made to purchase the old Christian church, which was moved to the new site on October 7, 1948. The parsonage was built in 1960. In 1962 some interior remodeling of the church was done. In 1964 the exterior of the entrance of the church was renovated with wood siding and in 1966 shrubs were set out by the steps. In 1973 and 1975 improvement work was done in the church basement. In 1989 the last service for the congregation was held.

Results 31 to 40 of 79