Archival description
20120524-007
2012-05-24
Part of John Froschauer Photographs

Water retention and filtration system being constructed as part of the now athletic fields at PLU on Thursday, May 24, 2012

20120524-008
2012-05-24
Part of John Froschauer Photographs

Water retention and filtration system being constructed as part of the now athletic fields at PLU on Thursday, May 24, 2012

20120524-009
2012-05-24
Part of John Froschauer Photographs

Water retention and filtration system being constructed as part of the now athletic fields at PLU on Thursday, May 24, 2012

20120608-001
2012-06-08
Part of John Froschauer Photographs

A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.

20120608-002
2012-06-08
Part of John Froschauer Photographs

A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.

20120608-003
2012-06-08
Part of John Froschauer Photographs

A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.

20120608-004
2012-06-08
Part of John Froschauer Photographs

A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.

20120608-005
2012-06-08
Part of John Froschauer Photographs

A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.

20120611-002
2012-06-11
Part of John Froschauer Photographs

A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.

20120611-003
2012-06-11
Part of John Froschauer Photographs

A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.