Print preview Close

Showing 23 results

Archival description
20120608-003
2012-06-08
Part of John Froschauer Photographs

A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.

20120608-002
2012-06-08
Part of John Froschauer Photographs

A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.

20120608-001
2012-06-08
Part of John Froschauer Photographs

A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.