A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.
View of Mt. Rainier over Ramstad Hall from the roof of the Karen Hille Phillips Center on Monday, June 11, 2012.
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
President Thomas Krise and Patty at lunch at 208 Garfield, PLU on Monday, June 18, 2012.
President Thomas Krise and Patty at lunch at 208 Garfield, PLU on Monday, June 18, 2012.
President Thomas Krise and Patty at lunch at 208 Garfield, PLU on Monday, June 18, 2012.
President Thomas Krise and Patty at lunch at 208 Garfield, PLU on Monday, June 18, 2012.