A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.
A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
Border for the synthetic field at PLU on Friday, June 15, 2012.
Athletic field construction at PLU on Friday, June 15, 2012.
Irrigation lines for the grass field being constructed at PLU on Friday, June 15, 2012.
Irrigation lines for the grass field being constructed at PLU on Friday, June 15, 2012.