A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
Scaffolding coming down in the pool at PLU, on Tuesday, July 10, 2012.
Scaffolding coming down in the pool at PLU, on Tuesday, July 10, 2012.
Swimming pool reconstruction at PLU, on Monday, July 23, 2012.
New glass is installed in the walls of the swimming pool at PLU, on Monday, July 23, 2012.
Swimming pool reconstruction at PLU, on Monday, July 23, 2012.
Swimming pool reconstruction at PLU, on Monday, July 23, 2012.