- Item
- 1947
Science Hall cornerstone laying. President Eastvold center, HL Foss at left.
Science Hall cornerstone laying. President Eastvold center, HL Foss at left.
Science Hall cornerstone laying. President Eastvold second at left.
May 17, 1947: Ground-breaking exercises in connection with the building of the new science hall at Pacific Lutheran College. Reading left to right: Mr. Geo. Warter, contractor; Dr. J.P. Pflueger, Religion department; Mr.John Richards, architect; Reverend Lauritz Rasmussen, alumnus 1900; Dr. E. B. Steen, College Pastor; Professor Anders W. Ramstad, Chemistry department; Dr. Walter H. Schaefer, Biology department; Dr. O. M. Jordahl, Physics department; Dr. Philip E. Hauge, Dean of the College, Prof. Johan U. Xavier, Librarian Emeritus, Dr. Seth C. Eastvold, President of the College.
President Eastvold at the Science hall cornerstone laying.
Science Hall cornerstone laying. President Eastvold second from left.
Science Hall cornerstone laying. President Eastvold center, HL Foss at left.
Students on upper campus with Xavier Hall, Old Main, Classroom Building, Ramstad Hall, and Eastvold Chapel visible.
President Wiegman and others as the Clock Tower goes up