Showing 50 results

Archival description
Hauge Administration Building Item People With digital objects
Print preview View:

0868

This is the site of construction of the new Tacoma-Pierce Administration Building, which was completed in 1960 and later renamed for Philip E. Hauge, an employee at the college from 1920 to 1976. President Eastvold (left) and Philip Hauge pictured.

0876

President Seth Eastvold with an unidentified man at the dedication of the Tacoma-Pierce Administration Building on October 16, 1960.

0877

President Seth Eastvold and his wife Enga cut the ribbon at the dedication of the Tacoma-Pierce Administration Building on October 16, 1960.

UA00093

Staff and students leaving the Tacoma-Pierce Administration Building after class.


Back of photo: Hauge PLU winter 60

Results 11 to 20 of 50