Showing 2096 results

Archival description
Construction With digital objects
Print preview View:

20130819-017

Installing the new name over the entrance in the remodel of the Karen Hille Phillips Center for the Performing Arts and Eastvold Auditorium at PLU on Monday, August 19, 2013.

20130819-018

Lifting a panel of the new name during installation over the entrance in the remodel of the Karen Hille Phillips Center for the Performing Arts and Eastvold Auditorium at PLU on Monday, August 19, 2013.

20130819-019

Installing the new name over the entrance in the remodel of the Karen Hille Phillips Center for the Performing Arts and Eastvold Auditorium at PLU on Monday, August 19, 2013.

20130620-010

Work on the door frame to the orchestra pit access in the Karen Hille Phillips Center for the Performing Arts, PLU on Thursday, June 20, 2013

Results 2071 to 2080 of 2096