- UA 7.7.1-16--B24
- 1963
Faculty, administration, and graduates descend to Lower Campus for Commencement. Construction materials are visible near the walking path.
Faculty, administration, and graduates descend to Lower Campus for Commencement. Construction materials are visible near the walking path.
Faculty, administration, and graduates descend to Lower Campus for Commencement. Construction materials are visible near the walking path.
Homecoming royalty seated in a convertible on Lower Campus.
Graduates and others on upper campus with Ramstad Hall and Old Main in the background.
President Seth Eastvold (3rd from right), Halfdan Foss (2nd from right), and others standing on near Ramstad Hall with Eastvold Chapel in the background.
The start of Ramstad Hall addition began in June 1958.
Construction of the Science Hall Addition, 1958
Construction of Science Hall Addition 1958.
Construction of addition to Science Hall 1958.