Showing 23 results
Archival description- 2012-07-23
Part of John Froschauer Photographs
New glass is installed in the walls of the swimming pool at PLU, on Monday, July 23, 2012.
- 2012-07-23
Part of John Froschauer Photographs
Swimming pool reconstruction at PLU, on Monday, July 23, 2012.
- 2012-07-23
Part of John Froschauer Photographs
Swimming pool reconstruction at PLU, on Monday, July 23, 2012.
- 2012-06-08
Part of John Froschauer Photographs
A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.
- 2012-06-08
Part of John Froschauer Photographs
A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.
- 2012-06-08
Part of John Froschauer Photographs
A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.
- 2013-01-25
Part of John Froschauer Photographs
Swimming Pool at PLU on Friday, January 25, 2013.
- 2012-07-10
Part of John Froschauer Photographs
Scaffolding coming down in the pool at PLU, on Tuesday, July 10, 2012.