A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.
Swimming pool reconstruction at PLU, on Monday, July 23, 2012.
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
New clocks in the swimming pool after construction at PLU on Tuesday, September 18, 2012.
Swimming pool reconstruction at PLU, on Monday, July 23, 2012.
New glass is carried in to be installed in the walls of the swimming pool at PLU, on Monday, July 23, 2012.
Swimming Pool at PLU on Friday, January 25, 2013.
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.