Print preview Close

Showing 18 results

Archival description
Hauge Administration Building Events With digital objects
Print preview View:

4x5-165

A large group gathered on Upper Campus for the groundbreaking of the Tacoma-Pierce Administration Building (later named Hauge Administration Building). Xavier Hall, the Kiosk, Harstad Hall, and Eastvold Chapel seen in the background.

0868

This is the site of construction of the new Tacoma-Pierce Administration Building, which was completed in 1960 and later renamed for Philip E. Hauge, an employee at the college from 1920 to 1976. President Eastvold (left) and Philip Hauge pictured.

0871

Construction begins on the new Tacoma-Pierce Administration Building, later renamed the Hauge Administration Building in honor of Philip E. Hauge who worked at the college from 1920 to 1976.

0876

President Seth Eastvold with an unidentified man at the dedication of the Tacoma-Pierce Administration Building on October 16, 1960.

0877

President Seth Eastvold and his wife Enga cut the ribbon at the dedication of the Tacoma-Pierce Administration Building on October 16, 1960.

0866

April 8, 1959, a crowd gathers for the groundbreaking ceremony for the new administration building. Completed in 1960, it was first called the Tacoma-Pierce Administration Building, but was later renamed in honor of Philip E. Hauge, who worked at the college from 1920 to 1976.

0869

Construction begins on the new Tacoma-Pierce Administration Building. Completed in 1960, it was later renamed for Philip E. Hauge, an employee at the college from 1920 to 1960.

0878

Tacoma Mayor Ben Hanson and the Chairman of the Pierce County Commissioners Harry Sprinker receive honorary keys to the Tacoma-Pierce Administration Building from President Seth Eastvold at the building's dedication on October 16, 1960.

Results 1 to 10 of 18