- UA 7.7.1-16--B24
Faculty, administration, and graduates descend to Lower Campus for Commencement. Construction materials are visible near the walking path.
Faculty, administration, and graduates descend to Lower Campus for Commencement. Construction materials are visible near the walking path.
Faculty, administration, and graduates descend to Lower Campus for Commencement. Construction materials are visible near the walking path.
President Seth Eastvold (holding mic stand) and others (including Milton Nesvig at far left) at a construction site.
Halfdan Foss (2nd from left), President Eastvold (3rd from left) and others at a construction site.
President Seth C. Eastvold lays the cornerstone for the new College Union Building in 1955.