Showing 143 results
Archival description143 results with digital objects Show results with digital objects
- Item
- Item
- 2012-07-10
Part of John Froschauer Photographs
Scaffolding coming down in the pool at PLU, on Tuesday, July 10, 2012.
- 2012-07-10
Part of John Froschauer Photographs
Scaffolding coming down in the pool at PLU, on Tuesday, July 10, 2012.
- 2012-06-08
Part of John Froschauer Photographs
A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.
- 2012-06-11
Part of John Froschauer Photographs
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
- 2012-06-11
Part of John Froschauer Photographs
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
- 2012-09-18
Part of John Froschauer Photographs
First use of the swimming pool after construction at PLU on Tuesday, September 18, 2012.