- 2012-09-18
Part of John Froschauer Photographs
First use of the swimming pool after construction at PLU on Tuesday, September 18, 2012.
Part of John Froschauer Photographs
First use of the swimming pool after construction at PLU on Tuesday, September 18, 2012.
Part of John Froschauer Photographs
Swimming pool reconstruction at PLU, on Monday, July 23, 2012.
Part of John Froschauer Photographs
A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.