- Item
- 1966
Part of Kenneth Dunmire Photographs
Dr. Kenneth Christopherson lectures in the Administration Building 1965-1967
Part of Kenneth Dunmire Photographs
Dr. Kenneth Christopherson lectures in the Administration Building 1965-1967
This is the site of construction of the new Tacoma-Pierce Administration Building, which was completed in 1960 and later renamed for Philip E. Hauge, an employee at the college from 1920 to 1976. President Eastvold (left) and Philip Hauge pictured.
Construction begins on the new Tacoma-Pierce Administration Building, later renamed the Hauge Administration Building in honor of Philip E. Hauge who worked at the college from 1920 to 1976.
Construction begins on the new Tacoma-Pierce Administration Building. Completed in 1960, it was later renamed for Philip E. Hauge, an employee at the college from 1920 to 1960.
President Eastvold (right) and another man unveiling dedication plaque at Hauge Administration Building.
Graduates standing in front of the Hauge Administration Building
Construction continues on the new Tacoma-Pierce Administration Building. Completed in 1960, it was later renamed in honor of Philip E. Hauge, an employee at the college from 1920 to 1976.