Swimming Pool at PLU on Friday, January 25, 2013.
Swim team members Hanna Armstrong (black cap) and Kina Ackerman (white cap) in the pool at PLU on Tuesday, October 23, 2012.
Swim team member Kina Ackerman in the pool at PLU on Tuesday, October 23, 2012.
at PLU on Tuesday, October 23, 2012.
Swim team member Hanna Armstrong in the pool at PLU on Tuesday, October 23, 2012.
Swim team member Kina Ackerman in the pool at PLU on Tuesday, October 23, 2012.
Swim team at PLU on Tuesday, October 23, 2012.
A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.