A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.
Construction of PLU swimming pool.
Back of photo: Pool
Swimming pool reconstruction at PLU, on Monday, July 23, 2012.
New glass is carried in to be installed in the walls of the swimming pool at PLU, on Monday, July 23, 2012.
Work on Swimming Pool roof
New clocks in the swimming pool after construction at PLU on Tuesday, September 18, 2012.
New glass is installed in the walls of the swimming pool at PLU, on Monday, July 23, 2012.
Swimming pool reconstruction at PLU, on Monday, July 23, 2012.
Swimming pool reconstruction at PLU, on Monday, July 23, 2012.