Construction of PLU swimming pool.
Back of photo: Pool
Construction of PLU swimming pool.
Back of photo: Pool
Opening Convocation 1995
Work on Swimming Pool roof
Work on Swimming Pool roof
New glass is installed in the walls of the swimming pool at PLU, on Monday, July 23, 2012.
Swimming pool reconstruction at PLU, on Monday, July 23, 2012.
Swimming pool reconstruction at PLU, on Monday, July 23, 2012.
A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.
A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.
A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.