Print preview Close

Showing 420 results

Archival description
John Froschauer Photographs University Buildings Construction With digital objects
Print preview View:

20120611-004

A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.

20120611-005

A 66-foot long 16-ton structural glue laminate wood beam on scaffolding just below the one it will replace inside the pool building on Monday, June 11, 2012. This will replace the existing one that cracked during the ice storm.

20130819-005

Installing the new name over the arches of the entrance in the remodel of the Karen Hille Phillips Center for the Performing Arts and Eastvold Auditorium at PLU on Monday, August 19, 2013.

20130819-007

Lifting a panel of the new name during installation over the entrance in the remodel of the Karen Hille Phillips Center for the Performing Arts and Eastvold Auditorium at PLU on Monday, August 19, 2013.

20130819-010

Lifting a panel of the new name during installation over the entrance in the remodel of the Karen Hille Phillips Center for the Performing Arts and Eastvold Auditorium at PLU on Monday, August 19, 2013.

20130819-011

Remodel of the Karen Hille Phillips Center for the Performing Arts and Eastvold Auditorium at PLU on Monday, August 19, 2013.

20130819-013

Lifting a panel of the new name during installation over the entrance in the remodel of the Karen Hille Phillips Center for the Performing Arts and Eastvold Auditorium at PLU on Monday, August 19, 2013.

20130819-015

Lifting a panel of the new name during installation over the entrance in the remodel of the Karen Hille Phillips Center for the Performing Arts and Eastvold Auditorium at PLU on Monday, August 19, 2013.

20130822-003

Installing the woodwork in the remodel of the Karen Hille Phillips Center for the Performing Arts at PLU on Thursday, August 22, 2013.

Results 51 to 60 of 420