Artist's Rendering Swimming Pool
Sketch for interior of new swimming pool which was built in 1965.
Sketch for the new swimming pool which was built in 1965.
A 66-foot long 16-ton structural glue laminate wood beam is maneuvered between scaffolding inside the pool building on Friday, June 8, 2012. This will replace the existing one that cracked during the ice storm.
Swimming pool reconstruction at PLU, on Monday, July 23, 2012.
Matt Sellman, head coach of the swim teams talks to the swimmers during practice on Tuesday, September 18, 2012.
First use of the swimming pool after construction at PLU on Tuesday, September 18, 2012.
First use of the swimming pool after construction at PLU on Tuesday, September 18, 2012.
Swim team member Kina Ackerman in the pool at PLU on Tuesday, October 23, 2012.
Swim team member Hanna Armstrong in the pool at PLU on Tuesday, October 23, 2012.